High-Load Ground Screw Foundation Integration

Rather than standard driven piles, the True Organic site utilized 436 APA ground screw anchors engineered to achieve a 6′ 7″ embedment depth. Ground screws deliver optimal uplift resistance and long-term structural integrity in native Central Valley soil types, eliminating the need for pre-drilling while meeting rigid design loading thresholds.

Integrating Nextracker XTR with APA A-Frame foundations across 24 tables required precise torque tube alignment, riser leveling, and slew drive placement. Sunstall’s team performed strict quality control on all bomb tails, BHAs, and dampeners—verifying 109 ft-lbs torque specs for M12 hardware.

1,107

Hours of Work

Aug 2026

Construction Date

0.825

Size[MW]

Helm, CA

Location

Proactive Technical Problem-Solving

100% Completion: Key Takeaways for Solar Asset Owners & EPCs

  1. Desktop Estimates Must Match Field Realities: Validating site conditions early ensures foundation choices (like ground screws vs. driven piles) perform reliably over a 25+ year operational lifespan.
  2. Hybrid Racking Expertise Matters: Combining tracker systems from one vendor with foundation mounts from another requires an installation team thoroughly versed in technical bulletins and multi-vendor coordination.
  3. Turnkey Reliability: From initial mobilization to commissioning, experienced field management protects asset owners from long-term liability while keeping project schedules on track.